Micro-Grid Energy Arbitrator — OpenEnv

Team RauResh — IIT Mandi

An OpenEnv-compliant environment where an AI agent manages energy flows across a solar PV array, lithium battery bank, and main electricity grid over a 24-hour horizon. Grounded in real hardware constraints (ESP32 sensor noise, LFP battery chemistry, Indian C&I tariff structures) and modelled after IIT Mandi's campus micro-grid.


Why This Domain

Grid-scale energy management is one of the most consequential optimisation problems of the next decade. A poorly-timed energy purchase during peak hours costs money. A depleted battery during a storm causes a blackout. This environment forces an agent to reason about:

  • —Uncertainty — solar forecasts are noisy; weather changes hour-to-hour
  • —Arbitrage — buy cheap at midnight, sell expensive at peak
  • —Safety — never let battery SoC hit zero (catastrophic penalty)
  • —Load priority — shed deferrable loads before essential ones in a crisis

Environment Description

One episode = 24 hours of micro-grid operation. One timestep = 1 hour.

The agent observes the full grid state each hour and chooses one action:

ActionDescription
buy_energy:<kw>Purchase kW from main grid → charges battery
sell_energy:<kw>Export kW from battery → revenue
store_energy:0Route solar to battery, no grid trade
idle:0No transaction this hour
buy_energy:<kw>:shed_deferrableBuy + shed deferrable loads

Hardware configuration (modelled from real specs):

  • —Solar array: 20 kW rooftop mono-Si PV
  • —Battery bank: 50 kWh LFP lithium iron phosphate
  • —Location: IIT Mandi, Himachal Pradesh (31.7°N, 76.9°E)
  • —Sensor noise: Gaussian ±3% RMSE (ESP32 + ADS1115 ADC)

Observation Space

json
{
  "episode_id": "a3f9bc12",
  "task_id": "task_easy",
  "hour": 9,
  "battery": {
    "state_of_charge_pct": 62.4,
    "capacity_kwh": 50.0,
    "max_charge_rate_kw": 15.0,
    "max_discharge_rate_kw": 20.0,
    "temperature_c": 28.5
  },
  "current_solar_output_kw": 14.2,
  "irradiance_wm2": 748.3,
  "weather": "clear",
  "pricing": {
    "buy_price_per_kwh": 0.1536,
    "sell_price_per_kwh": 0.0922,
    "is_peak_hour": true
  },
  "load": {
    "total_demand_kw": 11.6,
    "critical_kw": 1.0,
    "essential_kw": 4.8,
    "deferrable_kw": 5.8
  },
  "forecast": {
    "irradiance_forecast_wm2": [812, 780, 690, 540, 340, 120],
    "price_forecast": [0.154, 0.155, 0.096, 0.096, 0.154, 0.153],
    "weather_sequence": ["clear","clear","partial_cloud","overcast","clear","clear"]
  },
  "total_cost_usd": 0.42,
  "total_revenue_usd": 0.18,
  "blackout_count": 0,
  "hours_above_reserve": 9,
  "cumulative_reward": 1.24
}

Reward Function

Shaped signal every timestep — never sparse:

ComponentRangeDescription
Economic gain-5.0 → +3.0Revenue minus cost per hour
Blackout penalty-50.0Immediate on SoC = 0%
Reserve bonus+0.15/hrBattery SoC above 20% floor
Low SoC warning-0.50/hrSoC between 10–20%
Efficiency bonus0 → +0.30Buy off-peak / sell peak
Shed penalty-1.0 to -20.0Load-shedding by tier
Step cost-0.01Fixed operational overhead

Tasks

Task 1 — Easy (task_easy) | Pass threshold: 0.70

  • —Initial SoC: 80%
  • —Weather: mostly clear (80% clear probability)
  • —Budget ceiling: $8.00

24-hour operation with comfortable battery and good solar. The agent needs to avoid blackouts and keep costs below budget. Basic buy/sell timing on the price curve is sufficient.

Task 2 — Medium (task_medium) | Pass threshold: 0.60

  • —Initial SoC: 50%
  • —Weather: mixed cloud (40% partial, 35% clear)
  • —Budget ceiling: $5.00

Intermittent solar means the agent cannot rely on free generation. It must use the 6-hour price forecast to buy during cheap off-peak windows and avoid over-spending during peak hours.

Task 3 — Hard (task_hard) | Pass threshold: 0.50

  • —Initial SoC: 25% (critically low)
  • —Weather: storm-dominant (45% storm, 35% overcast)
  • —Budget ceiling: $3.00

Near-zero solar. Price spikes during the storm. The agent must make strategic load-shedding decisions (deferrable loads first) while buying only when absolutely necessary to prevent blackout.


Grader Weights

ComponentEasyMediumHard
Uptime (no blackout)40%35%30%
Economic efficiency30%40%30%
Battery reserve20%15%15%
Blackout safety gate10%10%25%

Baseline Scores

Tested with meta-llama/Llama-3.1-8B-Instruct (seed=42):

TaskAvg ScorePass RateAvg Blackouts
task_easy~0.60~67%~0.3
task_medium~0.45~33%~0.7
task_hard~0.30~0%~1.2

Setup & Usage

Local

bash
git clone <repo>
cd openenv-microgrid
pip install -r requirements.txt

# Start API server
uvicorn app:app --host 0.0.0.0 --port 7860

# Run baseline inference
export HF_TOKEN=your_token
export MODEL_NAME=meta-llama/Llama-3.1-8B-Instruct
export API_BASE_URL=https://router.huggingface.co/v1
python inference.py

Docker

bash
docker build -t microgrid-env .
docker run -p 7860:7860 \
  -e HF_TOKEN=$HF_TOKEN \
  -e MODEL_NAME=meta-llama/Llama-3.1-8B-Instruct \
  microgrid-env

Python SDK

python
from env import MicroGridEnv, GridAction, ActionType
from graders import get_grader

env = MicroGridEnv(task_id="task_easy", seed=42)
obs = env.reset()

# Buy 5 kW off-peak
action = GridAction(action_type=ActionType.BUY_ENERGY, quantity_kw=5.0)
result = env.step(action)
print(result.reward)          # shaped reward this hour
print(result.observation.battery.state_of_charge_pct)  # SoC after

# Run 24 hours then grade
for _ in range(23):
    env.step(GridAction(action_type=ActionType.IDLE, quantity_kw=0.0))

grade = get_grader("task_easy").grade(env.state())
print(grade.score)   # 0.0 – 1.0

API

python
import requests
BASE = "http://localhost:7860"

# Start episode
r = requests.post(f"{BASE}/reset", json={"task_id": "task_medium", "seed": 42})
session_id = r.json()["session_id"]

# Buy 5 kW
r = requests.post(f"{BASE}/step", json={
    "session_id": session_id,
    "action_type": "buy_energy",
    "quantity_kw": 5.0
})
print(r.json()["reward"])

# Grade
r = requests.post(f"{BASE}/grade", json={"session_id": session_id})
print(r.json()["score"])

Project Structure

openenv-microgrid/
├── app.py               # FastAPI server — HF Spaces entrypoint
├── inference.py         # Baseline inference script (mandatory)
├── openenv.yaml         # OpenEnv spec file
├── validate.py          # Pre-submission validator
├── Dockerfile
├── requirements.txt
├── README.md
├── env/
│   ├── __init__.py
│   ├── models.py        # GridObservation, GridAction, GridReward (Pydantic)
│   ├── physics.py       # Solar irradiance, battery chemistry, weather, pricing
│   ├── environment.py   # MicroGridEnv — reset() / step() / state()
│   └── reward.py        # 6-component shaped reward function
├── graders/
│   ├── __init__.py
│   └── graders.py       # EasyGrader, MediumGrader, HardGrader
└── tests/
    └── test_env.py      # 46 unit tests

Physics Notes

All physical constants are grounded in real hardware:

  • —Battery efficiency: 92% round-trip (LFP chemistry datasheet)
  • —Temperature derating: -0.4%/°C panel output above 25°C (STC)
  • —Peukert correction: High discharge rates reduce usable capacity
  • —Sensor noise: Gaussian ±3% RMSE — calibrated to ESP32 + ADS1115 ADC
  • —Solar model: Clear-sky GHI sine curve at 31.7°N, 950 W/m² peak
  • —Tariff: Indian C&I TOU — ₹8/kWh base (≈$0.096), 1.6× peak multiplier