Spa-Bench/spa-bench-model-groot-n1-7-full-finetune-epoch-12
GR00T-N1.7 Full Fine-Tune — Spa-Bench Epoch 12
This checkpoint is released as an anonymous supplementary artifact for a paper under double-blind review. It was evaluated on a physical SO-101 robot in Spa-Bench.
Model details
Training-data documentation: `spa-bench-training-teleoperation-1200`.
Physical evaluation
25/120 familiar trials succeeded. Evaluation stopped before the withheld-composition protocol, so this is a partial result. These are physical rollout results, not simulation metrics.
Rollouts: `spa-bench-eval-rollouts-groot-n1-7-full-finetune-partial`.
Limitations and safety
Training used a two-camera projection of the 1,200-episode release. This condition received a small upward initialization assist, limiting direct ablation claims. Robot policies can move hardware unexpectedly. Use conservative limits, an accessible emergency stop, a clear workspace, and direct supervision. Do not deploy unattended or in safety-critical settings.
Double-blind release note
Author, institution, source-repository, and archival citation details are intentionally omitted during review. They will be restored in the archival release.
