Macrostack — Datacentre Energy 21 options for powering and cooling AI infrastructure, compared on the field that actually decides them: lead time. Maintained at macrostack.net/energy. Verified 2026-09-06. Why this exists The binding constraint on AI in 2026 is not chip allocation. It is megawatts. US grid interconnection queue: 2,600+ GW, waits approaching 5 years Projects that withdraw before energising: nearly 80% Data centre share of US electricity: 6-12% of… See the full description on the dataset page: https://huggingface.co/datasets/Macrostack/macrostack-energy.