CREATE TABLE column_metadata (2 table_name TEXT NOT NULL,3 column_name TEXT NOT NULL,4 description TEXT,5 data_type TEXT,6 constraints TEXT,7 example_value TEXT,8 notes TEXT,9 PRIMARY KEY (table_name, column_name)10 )=Q+ indexsqlite_autoindex_column_metadata_1column_metadata �y�Etablerca_datarca_dataCREATE TABLE "rca_data" (11"Asset" TEXT,12 "Area" TEXT,13 "Equipment" TEXT,14 "RCA_ID" TEXT,15 "Failure_Event" TEXT,16 "Impact" INTEGER,17 "Downtime" INTEGER,18 "Root_Cause" TEXT,19 "Action" TEXT,20 "Action_Status" TEXT21) � ��������� �P
-'�OE�+#Mine BProcessing PlantJaw Crusher 2RCA 8On 3rd September, 2025 at 1050H, Jaw Crusher 2 experienced toggle plate failure during processing of oversized material. The hydraulic system pressure spiked beyond safety limits causing mechanical damage. Material feed size exceeded crusher specifications due to inadequate pre-screening.w@TInadequate feed size controlInstall automated feed size monitoring and implement pre-screening improvementsIn Progress�K
%+�=_�!Mine BRail LoadingBelt Conveyor 8RCA 7On 25th July, 2025 at 0915H, Belt Conveyor 8 experienced drive motor failure during material transport. Gearbox oil analysis showed excessive metal particles indicating gear wear. The failure occurred during a period of increased throughput requirements exceeding design capacity.S $Operational overload beyond design limitsImplement load monitoring system and establish operational capacity limitsCompleted�J
+#�KW�#Mine BWater TreatmentGenerator 3RCA 6At 1630H on 10th June, 2025, Generator 3 automatically shut down due to overheating during peak power demand period. Cooling system inspection revealed blocked radiator fins and reduced coolant flow. The blockage was caused by accumulated dust and debris from nearby crushing operations.O�Inadequate cooling system maintenanceModify air intake filtration and increase radiator cleaning frequencyIn Progress�A
'�;G�1Mine AHaul RoadDump Truck 15RCA 5On 1st May, 2025 at 1115H, Dump Truck 15 experienced hydraulic system failure during loading operation. Hydraulic fluid contamination was identified through analysis. The contamination caused pump seal failure and subsequent loss of hydraulic pressure for the dump bed mechanism.� Hydraulic fluid contaminationInstall improved filtration system and establish fluid quality monitoring protocolCompleted�R
9/�#O�=#Mine AUnderground OperationsVentilation Fan 4RCA 4At 0230H on 8th April, 2025, Ventilation Fan 4 shut down unexpectedly during night shift operations. Blade imbalance was detected by vibration monitoring system. Investigation found two fan blades had cracked due to metal fatigue, creating dangerous vibration levels. �HMetal fatigue from cyclic loadingImplement non-destructive testing schedule and replace fan blades with upgraded materialIn Progress�Y
%)�7s�1Mine ATailings DamPump Station 2RCA 3On 22nd February, 2025 at 1420H, Pump Station 2 experienced sudden pressure drop during tailings transfer operation. Investigation revealed multiple valve seal failures in Valve Assembly 5, causing significant slurry leakage. Environmental monitoring was immediately activated.�P0Valve seal degradation due to corrosive environmentInstall corrosion-resistant valve seals and implement enhanced chemical monitoringCompleted�g
-�K�)#Mine AProcessing PlantCrusher 1RCA 2At 0645H on 15th March, 2025, Crusher 1 experienced catastrophic bearing failure during routine operation. Metal fragments were detected in the oil sample analysis conducted on 10th March. The bearing completely seized causing emergency shutdown. Secondary damage occurred to the drive motor requiring replacement.&%�`Inadequate lubrication scheduleReplace bearing monitoring system and implement predictive maintenance programIn Progress�=-�##aMine AProcessing PlantCrusher 1RCA 1At 1831H on the 30th October, 2025,Equipment 1 started to trip on high torque. It continued to experienced multiple tripping until 2100H on the 2nd November. Among them, longest downtime was 32.12 hours.B@ OverloadingImplement interlock to prevent overloadingCompleted�1-�#%GMine AProcessing PlantCrusher 1RCA 1At 1831H on the 30th October, 2025,Equipment 1 started to trip on high torque. It continued to experienced multiple tripping until 2100H on the 2nd November. Among them, longest downtime was 32.12 hours.B@ Misal f Z N B 6 22*
� �